Project Details

Client: Built Fitout and Refurbishment
Location: London
Project Type: Commercial
Project value (approx.): £56k
Year Completed: 2024

Built Fitout and Refurbishment Ltd have refurbished 8 Devonshire Square into a commercial office area where people can rent office rooms, full floor offices, and meeting rooms as well as have monthly membership use facilities.

Our team at Helmsman manufactured, delivered, and installed a variety of our Heated Lockers. There were 35 three-compartment Laminate Lockers to accommodate 105 people, as well as installing 28 Z Lockers to accommodate 56 people.

Heated Z lockers not only offer a stylish storage solution, but this unique shape makes them the perfect design for heated lockers. Simply hang your damp clothes inside and let the Heated Locker do the hard work. Single and twin tube heaters are available, with the heat source plugging into a 3-pin power socket or wired into a fused switch.

The lockers were manufactured with wet specifications which means that the Laminate lockers are manufactured for an environment where there is humidity, which can also withstand rust. The lockers are manufactured with an aluminium and stainless-steel body and laminate doors.

The specifications of the three-compartment lockers and Z lockers were to be 1775mm high, 298mm wide, and 450mm deep. Along with the lockers, the lockers were all installed with seat stands. The measurement of the seat stand was 300mm wide and 450 deep, the stands were powder coated in colour ‘Black’, to match the body of the lockers. Whereas the seating was in our standard slats of Ash Hardwood.

The body of the Heated Lockers was powder coated in ‘Black’. The laminate doors were in the vibrant colour of ‘Ballerina’. The heated lockers were finished with Lowe & Fletcher Nimbus in ‘Black’ which is a great choice as it secures personal belongings, along with many benefits such as having a collection of user modes such as public, private, or technician mode.

Was great working alongside Built Fitout and Refurbishment Ltd on this project.

If you need some heated lockers for your project or want to find out more information about the range of products, call 01284 530491 or get your quote here.

Take a look at our other case studies here:

Bespoke Z Lockers at 10 Station Road

Our team have completed a fantastic project with Cube Install ltd, to install bespoke Z lockers at 10 station road in Cambridge.

Laminate Heated Lockers at Circle Square

Here at Helmsman, our team had the opportunity to manufacture and install Laminate Heated Lockers at Circle Square based in Manchester. .

Bespoke Laminate Z Lockers at Tensar, A Division of CMC

Our team manufactured and installed Bespoke Laminate Z Lockers in beautiful colour of ‘Country Oak’ at Tensar, a division of CMC. Read More

Metal Z Lockers at Northern Trains

It has been great working alongside with Northern Trains once again. Our team manufactured and installed metal Z Lockers!

Laminate Lockers at Amazon

Here at Helmsman, our team had the pleasure to work along side with Amazon, by providing with laminate lockers.

Essential Staff Lockers at Alexander Dennis Ltd

Take a read of our case study of essential staff lockers, a variety of metal lockers, garment dispensers and garment collectors, manufactured and installed at Alexander Dennis Ltd.

Bespoke Laminate Lockers at Bombardier Services UK Ltd

Helmsman manufactured, delivered, and installed bespoke laminate lockers with sloping tops to our returning customer: Bombardier Services UK Ltd.

Bespoke Z Lockers at Greenmarket

Helmsman manufactured, developed and installed bespoke Z lockers at Greenmarket in Dundee. What a great project!