Heated Z Lockers at BT Bristol

Project Details

Client: Honeyfield Property Services
Location: Bristol
Project Type: Heated Lockers
Project Value (approx): £12k
Year Completed: 2023

Heated Z Lockers Graphite

BT are the largest provider of fixed-line, broadband and mobile services in the UK. With a rising number of employees, their new state of the art office building in Bristol has been built. With 190,000 sqft of office space, on 13 storeys and in a stunning waterfront location, the new BT Bristol building will become one of the company’s key hubs.

As a part of the development of the company, BT are planning to reduce their number of working locations from over 300 to just 30. BT Bristol features flexible workspaces, the latest IT and smart building technology, restaurants and cafes and a rooftop wildflower meadow terrace with panoramic views of Bristol.

An important aspect of the development of this new building was its eco credentials. With the whole company seeking to reduce its carbon emissions, choices were made throughout the design and build process to support this aim. As well as the rooftop meadow, the building features a heating system from the low-carbon district heating network and aspects that encourage employees to make greener choices about their travel to and from work. In order to support this, the BT Bristol office building features parking for around 270 bicycles, as well as changing rooms, showers and lockers.

Helmsman were excited to be contacted by Honeyfield Property Services to supply and install the lockers at BT Bristol. The client requested Heated Z Lockers, with hasp locks for the user to attach their own padlock.

Heated Lockers are a great addition to a cycle storage area, providing a storage solution that can dry damp clothes as well as keep your items safe during the working day. The Z shape is particularly good choice for heated lockers, as the user can hang their clothing in the taller area of the locker and let the heated locker do the hard work.

Air flows through the locker through a perforated base, and perforations at the top of the locker allow the damp air to escape. The tube heaters are positioned within the stands of the locker and can be either plugged into a 3-pin power socket or wired into a fused switch.

In keeping with BT Bristol’s aim for carbon efficiency, the laminate used for the project was Graphite by BioCarbon Laminates. This is one of Helmsman’s standard laminate options, and is a carbon neutral material.

In addition to the lockers, we also supplied and installed seat stands, with adjustable feet, and ash hardwood seat slats. The stands, back and sides of the lockers were all cladded with matching Graphite laminate, and the lockers were finished with black circle discs with white numbering.

It was great to work with Honeyfield Property Services on this project, and wish the BT Bristol office much success in the future.

If you have a similar project, or want to find out more about our Heated Lockers, give us a call on 01284727626 or fill in our contact form here.

Take a look at our other Heated Lockers and Z Locker case studies here:

Drying Lockers at BAE Systems

Heated Z Locker at Four New Bailey

Northgate House Lockers and Cubicles Project

Heated Z Lockers at The Pattern Shop

Bespoke Z Lockers at 10 Station Road

Laminate Heated Lockers at Circle Square