Lockers, Cubicles and Bespoke Products at Lee Valley Ice Centre

Project Details

Client: Buckingham Group
Location: Lee Valley Ice Centre, London
Project Type: Full Redevelopment
Project Value (approx): £250k
Year Completed: 2023

Lee Valley Ice Centre CGI

Lee Valley Ice Centre originally opened in 1984, and before closing in 2021 welcomed over 279,000 visitors each year. With the old centre reaching the end of its operational life, it was time to design and build a brand new Ice Centre at Lee Valley Regional Park. The new centre, due to open in April 2023 will be home to 2 new ice rinks, doubling the capacity of the old centre, and inviting in new visitors as well as welcoming back those who visited before.

As part of the redevelopment of Lee Valley Ice Centre, 95% of the concrete from the old centre was used in the foundations of the new centre. With this and many other environmentally friendly choices made in the construction, Lee Valley Ice Centre will become the UK’s most sustainable Ice Centre.

The fully accessible centre will maximise the opportunity for sports for everyone, and with two Olympic-sized Ice Rinks, a brand-new café, gym, exercise studios and various other facilities, Lee Valley will be able to welcome up to 500,000 visitors. The range of facilities will encourage a variety of new visitors, from committed skaters, though to people stopping for a drink in the café before enjoying the green space in Lee Valley Regional Park.

At Helmsman, we were pleased to be contacted by the main contractors for Lee Valley, The Buckingham Group, to supply the lockers, cubicles, vanity units and bespoke high-level cladding. We manufactured and installed 268 Bespoke Heavy Duty Laminate Lockers, with a variety of compartment configurations, and a range of different locking options.

Our Heavy Duty Laminate lockers are a great option for high traffic areas, as they are more likely to withstand scratches and dents, so were a perfect choice for Lee Valley Ice Centre. The lockers also feature bespoke perforations in the doors and aluminium number plates. A selection of the lockers also have seat stands with the slats in matching laminate. A variety of locks were also used across the lockers in this project, with Ojmar Hasp locks the main choice for users to use their own padlocks, as well as Ojmar coin return locks and Lowe and Fletcher cam locks.

The cubicles chosen for this project were our Front Line Cubicles with Hidden Fixings. These cubicles are tailored to suit the needs of the particular project, with bespoke sizing available. The fixings are hidden to provide a smooth surface and aesthetic finish. The cubicles were manufactured with 12mm Solid Grade Laminate from BioCarbon Laminates in colour Luna Grey, a fantastic carbon-neutral option which aligns perfectly with Lee Valley’s aim to be the first sustainable Ice Centre in the UK.

As we manufacture all our products in house, and to order, we specialise in bespoke items. The project at Lee Valley Ice Centre featured bespoke high-level cladding, which our highly experienced installation team fitted on-site.

Other products on this project included metal framed IPS panels, using both Luna Grey and Elegant Grey laminates from BioCarbon Laminates, and Helmsman High Pressure Laminate Vanity Units.

It was great to work alongside Buckingham Group again for the Lee Valley Ice Centre project. Should you have a similar project, or want any more information on the products mentioned, give us a call on 01284727626 or contact us here.

Take a look at our other case studies here:

Drying Lockers at BAE Systems

Bespoke Leisure Lockers at Sobell Leisure Centre

Heavy Duty Lockers at Barnfield College

Heated Z Locker at Four New Bailey

Cringleford Sports Pavilion Leisure Package

Northgate House Lockers and Cubicles Project