metal

Metal Lockers at Hilton Hotel

Metal lockers at Hilton Gatwick Airport

Project details

Clients:  Excel Hospitality Ltd
Location:  Gatwick Airport, London
Project Type:  Metal Lockers
Project Value (Approx): £23K
Year completed: 2023

Hilton London Gatwick Airport is one of the largest hotels in Gatwick. Hilton Gatwick Airport has a covered link bridge access to the Sout Terminal and a free 24-hour monorail link to the North Terminal. One of our clients, the Hilton Hotel, is one for whom we have completed a number of projects.

Helmsman supplied and installed 46 full-length and 56 two-compartment Metal lockers with the specification of 1775mm high, 300mm wide, and 450mm deep. Metal lockers are a traditional material for the fabrication of lockers. Metal lockers are a popular option as they can come in a variety of compartments, shapes, colours, and sizes. Additionally, the material of the locker is reliable, easy to maintain, and a great storage solution as they are designed to last long term.

The client requested for the locker’s body to be powder coated in our standard shade of ‘Ice’, while the doors of the metal lockers were coated in ‘Blue grey’. We provide other varieties of colours for the metals that are powder-coated. The metal lockers were decorated with silver thermographic numbers on the top of the lockers along with Lowe & Fletched 2800 combination locks which come with a master key. The locks are reliable and can keep the staff to be ensured that their belongings are safe.

It was great working with Excel Hospitality for the Hilton Gatwick Airport project. If you have a similar project or need some information on the products, contact us today or give us a call at 01284 530491.

Take a look at our other case studies here:

Heated Z Locker at Four New Bailey

A recent project was completed at Four New Bailey, where our team manufactured and installed Heated Z Lockers with bespoke seat stands.

Cringleford Sports Pavilion Leisure Package

Project Details Client: Pentaco Construction Location: Norwich Project Type: Leisure Package Project Value (approx.):  £42.3K Year completed: 2024 New Cringleford Sports Pavilion ...

Northgate House Lockers and Cubicles Project

Northgate House is a new refurbished office fitout. Our team manufactured and installed lockers and cubicles as well as IPS and benches.

Bespoke Laminate Lockers at 25 Tavistock Place

Our team had the pleasure of manufacturing and installing bespoke laminate lockers at 25 Tavistock Place based in London.

Essential School Lockers at Newhouse Academy

Our team had the pleasure of manufacturing and installing 278 essential school lockers at Newhouse Academy.

Essential Metal Lockers at Greene King

Our team at Helmsman Had the pleasure of manufacturing and installing Essential Metal Lockers at Greene King.

Z locker

Z Lockers at Norther Rail in Manchester

Z Lockers at Northern Rail in Manchester

Project Details

Client: TMT Commercial Contractor Ltd
Location: Manchester
Project Type: Z Lockers
Project Value (approx.): £54k
Year completed: 2023

Northern Rail is owned by DfT OLR Holdings Limited (DOHL). Northern Rail plays an essential role in the north of England by connecting tens of thousands of people to work, leisure, and education. The Northern Rail is one of the largest train operators based in England.

Here at Helmsman we manufactured and installed 187 two-compartment Z Locker,  to accommodate 374 people. As requested by the client for three sets of changing rooms at Newton Heath Depot between the male, female, and manager changing rooms.

Z Lockers are a perfect space-optimizing locker design, they are also small footprints, however, maximize internal spaces. As one of the UK’s leading locker manufacturers, we also provide the project with Bespoke Z Locker designs as they were requested to be 1775mm high, 300mm wide, and 450mm deep which is above our standard size.

The lockers were powder coated in the color ‘Ice’ for the main body, while the doors were powder coated in ‘Blue grey’. The frame surrounding the custom Z Lockers was selected to be in a silver-grey shade. In addition, the clients requested a wall island bench seating in the length of 1000mm for the changing rooms. The desired shade for the seating was ‘Ash hardwood’. To ensure the staff’s peace of mind, Camlocks with 2 sets of keys were utilized, offering added security for their personal belongings.

It was great to work alongside TMT Commercial Contractors Ltd on this project in Manchester.

If you are looking for Z Lockers, or have a similar project you need help with, we can help. Give us a call at 01284 530491 or click here to get a quote.

Take a look at our other case studies here:

Heated Z Locker at Four New Bailey

A recent project was completed at Four New Bailey, where our team manufactured and installed Heated Z Lockers with bespoke seat stands.

Northgate House Lockers and Cubicles Project

Northgate House is a new refurbished office fitout. Our team manufactured and installed lockers and cubicles as well as IPS and benches.

Bespoke Laminate Lockers at 25 Tavistock Place

Our team had the pleasure of manufacturing and installing bespoke laminate lockers at 25 Tavistock Place based in London.

Bespoke Metal Lockers at Tenaris

Here at Helmsman, our team manufactured and installed bespoke metal lockers at Tenaris in Aberdeen. It’s a beautiful combination of blues.

Locker Project at Grand Central Station in Belfast

Our team had the pleasure of working alongside Farrans Constructions with a locker project at Grand Central Station in Belfast

Staff Lockers at Alexander Dennis Ltd

Take a read of the case study where our team had pleasure to work with Alexander Dennis once again on manufacturing and installing staff lockers and bench seating.

laminate

Laminate Lockers at Bombardier Services UK

Laminate Lockers at Bombardier Services UK

Project Details

Client: Bombardier Services UK Ltd
Location: Biggin Hill
Project Type: Industrial
Project Value (approx.):  £7.1k
Year completed: 2023

Bombardier Services UK based in Biggin Hill is business related to aircraft services such as manufacturing business jets, services and repairs, and general aircraft expertise.  The modern office and manufacturing space aligns with the high-quality business jets that they design and produce.

Our team at Helmsman manufactured and installed 40 two-compartment heavy-duty laminate lockers with the measurements to be 1900mm high, 300mm wide, and 450mm deep with the lockers to have sloped top-end panels to match the lockers that were manufactured and installed by Helmsman in 2022.

The laminate lockers were in colour by Greenlam in Primeval oak to match the light aesthetics of the room as well as to blend with the other lockers with the body of the locker to be ‘Ice’ which is a shade of grey. The laminate lockers were decorated with oval laminated number plates above the Camlocks made by Lowe & Fletcher. The locks are easy to use, with each staff member being allocated to their own lockers which would make the staff feel secure that their items are protected.

It was great to work with Bombardier Services UK again on the project. If you have a similar project or want to know more about laminate lockers, give us a call at 01284 530491 or get a quote here.

Take a look at our other case studies here:

Bespoke Laminate Lockers at 25 Tavistock Place

Our team had the pleasure of manufacturing and installing bespoke laminate lockers at 25 Tavistock Place based in London.

Bespoke Metal Lockers at Tenaris

Here at Helmsman, our team manufactured and installed bespoke metal lockers at Tenaris in Aberdeen. It’s a beautiful combination of blues.

Locker Project at Grand Central Station in Belfast

Our team had the pleasure of working alongside Farrans Constructions with a locker project at Grand Central Station in Belfast

After-Sales Service at Clarendon Road

Our team recently completed the project at Clarendon Road. Clients requested for an after-sales service to upgrade camlocks to digital locks.

Maldron Hotel Laminate Locker Project

Our team worked closely alongside CField construction, manufactured and installed laminate lockers at Maldron Hotel in Brighton. For more information and specification of laminate lockers take a read of our case study here.

Temple Point Locker Project

Here at Helmsman, we had the pleasure of manufacturing and install laminate lockers and metal lockers at Temple Point in Bristol.

Laminate Lockers at Melbourne Science Park

Laminate lockers at Melbourne Science Park

Project Details

Client: SDC Builders LTD
Location: Cambridge Rd, Melbourne
Project Type: Office
Project Value (approx.): £25k
Year completed: 2023.

Melbourne Science Park is part of Bruntwood SciTech which covers 17 acres with nine buildings. Their aim is to make the science park a world-class innovation and life science campus which would be including a village green, a gastro-style restaurant, and a pub that is open to the community.

The Melbourne Science Park’s aim is to contribute yearly towards the economy. Also, to help the regional science and tech sector to succeed in the future.

Our team at Helmsman has manufactured and installed 57 three-compartment and 8 two-compartment laminate lockers. The laminate lockers were requested by the clients to be Wet Spec, which helps the material not to rust, peel or crack under humidity. The measurements of the lockers were 1775mm high, 300mm wide, and 450mm deep. The bottom locker doors were wished to be dropped.

The locker’s body was powder coated Jet Black, with the laminate door, was in ‘Neutral Medium Gray,’ provided by Fundermax. Our laminate lockers provide a modern, heavy-duty finish and are great to be used regularly. The lockers were finished with oval laminate number plates above the nimbus digital combination in black made by Lowe & Fletcher. This can keep the employees and residents assured that their personal belongings are secure and untouched.

As always, our installation team worked hard to provide the best finish to the project. It was great to work with SDC Builders Ltd and we would like to wish Melbourne Science Park great success in the future.

If you have a similar project or want to know more about laminate lockers, give us a call at  01284 530496 or click here to get a quote.

Take a look at our other case studies here:

Heated Z Locker at Four New Bailey

A recent project was completed at Four New Bailey, where our team manufactured and installed Heated Z Lockers with bespoke seat stands.

Cringleford Sports Pavilion Leisure Package

Project Details Client: Pentaco Construction Location: Norwich Project Type: Leisure Package Project Value (approx.):  £42.3K Year completed: 2024 New Cringleford Sports Pavilion ...

Northgate House Lockers and Cubicles Project

Northgate House is a new refurbished office fitout. Our team manufactured and installed lockers and cubicles as well as IPS and benches.

Bespoke Laminate Lockers at 25 Tavistock Place

Our team had the pleasure of manufacturing and installing bespoke laminate lockers at 25 Tavistock Place based in London.

Essential School Lockers at Newhouse Academy

Our team had the pleasure of manufacturing and installing 278 essential school lockers at Newhouse Academy.

Essential Metal Lockers at Greene King

Our team at Helmsman Had the pleasure of manufacturing and installing Essential Metal Lockers at Greene King.

Heated Z Lockers at BT Bristol

Heated Z Lockers at BT Bristol

Heated Z Lockers at BT Bristol

Project Details

Client: Honeyfield Property Services
Location: Bristol
Project Type: Heated Lockers
Project Value (approx): £12k
Year Completed: 2023

Heated Z Lockers Graphite

BT are the largest provider of fixed-line, broadband and mobile services in the UK. With a rising number of employees, their new state of the art office building in Bristol has been built. With 190,000 sqft of office space, on 13 storeys and in a stunning waterfront location, the new BT Bristol building will become one of the company’s key hubs.

As a part of the development of the company, BT are planning to reduce their number of working locations from over 300 to just 30. BT Bristol features flexible workspaces, the latest IT and smart building technology, restaurants and cafes and a rooftop wildflower meadow terrace with panoramic views of Bristol.

An important aspect of the development of this new building was its eco credentials. With the whole company seeking to reduce its carbon emissions, choices were made throughout the design and build process to support this aim. As well as the rooftop meadow, the building features a heating system from the low-carbon district heating network and aspects that encourage employees to make greener choices about their travel to and from work. In order to support this, the BT Bristol office building features parking for around 270 bicycles, as well as changing rooms, showers and lockers.

Helmsman were excited to be contacted by Honeyfield Property Services to supply and install the lockers at BT Bristol. The client requested Heated Z Lockers, with hasp locks for the user to attach their own padlock.

Heated Lockers are a great addition to a cycle storage area, providing a storage solution that can dry damp clothes as well as keep your items safe during the working day. The Z shape is particularly good choice for heated lockers, as the user can hang their clothing in the taller area of the locker and let the heated locker do the hard work.

Air flows through the locker through a perforated base, and perforations at the top of the locker allow the damp air to escape. The tube heaters are positioned within the stands of the locker and can be either plugged into a 3-pin power socket or wired into a fused switch.

In keeping with BT Bristol’s aim for carbon efficiency, the laminate used for the project was Graphite by BioCarbon Laminates. This is one of Helmsman’s standard laminate options, and is a carbon neutral material.

In addition to the lockers, we also supplied and installed seat stands, with adjustable feet, and ash hardwood seat slats. The stands, back and sides of the lockers were all cladded with matching Graphite laminate, and the lockers were finished with black circle discs with white numbering.

It was great to work with Honeyfield Property Services on this project, and wish the BT Bristol office much success in the future.

If you have a similar project, or want to find out more about our Heated Lockers, give us a call on 01284727626 or fill in our contact form here.

Take a look at our other Heated Lockers and Z Locker case studies here:

Heated Z Locker at Four New Bailey

Northgate House Lockers and Cubicles Project

Heated Z Lockers at The Pattern Shop

Bespoke Z Lockers at 10 Station Road

Laminate Heated Lockers at Circle Square

Heated Laminate Lockers at 8 Devonshire Square

Z Lockers in mirror

Laminate and Z Lockers at 72 Welbeck Street, London

Laminate Lockers & Z Lockers at 72 Welbeck Street, London

Project Details

Client: Specialist Joinery Group
Location: 72 Welbeck Street, London
Project Type: Commuter Changing Rooms
Project Value (approx): £30k
Year Completed: 2022

Z Lockers in Mirror

This brand-new sophisticated working environment in London was designed with best-in-class facilities, so it was an honour for Helmsman to be asked to supply the lockers. The building was created with an all-electric HVAC system that uses renewable energy, and so will be net zero carbon operationally. The 2500sqft roof terrace boasts views over London, and the facilities inside are just as impressive.

With the cycle to work scheme fast becoming more popular amongst workplaces, its no surprise that 72 Welbeck Street provided 114 spaces for bicycles, 9 showers and 138 lockers in their luxurious new commuter facilities.

It was great to work with Specialist Joinery Group again on this project. In order to optimise the storage for the lockers, the client chose a variety of locker designs, including Z Lockers and 3 Compartment Laminate Lockers. Z Lockers are a great choice as they allow 2 people to store their items in the footprint of one locker and allow hanging of clothes, perfect for those who have cycled to work and are getting changed. While laminate lockers are perfect for a professional heavy duty finish.

Both the Z Lockers and Laminate lockers chosen were manufactured from aluminium and stainless steel with Abet Laminate doors in colour Spring White. These materials are designed to withstand a wet environment and so are perfect for the changing rooms at 72 Welbeck Street.  The Z Lockers also featured stands with seats, with slats in matching laminate from Abet.

All of the lockers were finished with black circle number plates and Lowe and Fletcher camlocks. The perfect choice to keep the changing rooms looking slick and modern.

This was another great project to be a part of in the heart of London, and it’s great to see that our lockers look and feel just like the designer intended.

If you need Z lockers, Laminate lockers or want to chat with us about any bespoke locker requirements, give us a call on 01284727626 or click here to get a quote.

Take a look at our other case studies here:

Heated Z Locker at Four New Bailey

Cringleford Sports Pavilion Leisure Package

Northgate House Lockers and Cubicles Project

Bespoke Laminate Lockers at 25 Tavistock Place

Z Lockers

Z Lockers at Paddington Square, London

Z Lockers at Paddington Square, London

Project Details

Client: Lucas Ltd
Location: Paddington Square, London
Project Type: Z Lockers
Project Value (approx): £85k
Year Completed: 2022

Z Lockers

Paddington Square is a brand new working, shopping and dining quarter opening in 2023. The impressive transparent, glass building, also known as Paddington Cube, provides up to 50,000sqm of floor space with offices, retail units, a café, a bar and restaurants. The area underneath the building features the Bakerloo Line Underground Entrance and ticket hall.

Following their work on a marketing suite at Paddington Square, Lucas Ltd were invited back to provide a full back of house painting and fit-out service across the basement, ground and first floor levels. Helmsman were delighted to assist them with the lockers in the project.

The client requested laminate Z Lockers for two sets of changing rooms at Paddington Square. Between the male and female changing rooms we supplied and installed 268 Z Lockers, for 536 people. Z Lockers are a fantastic space optimising locker design, with a small footprint and maximised internal space. As one of the UK’s leading locker manufacturers, we specialise in bespoke locker design. The locker sizes requested were not our standard sizes, so a bespoke Z Locker design was created for the project at 1525 x 325 x 500mm.

As the Z Lockers were for a changing room environment, a wet spec was needed. The body was manufactured from aluminium and stainless steel and powder coated in colour Ice, with the doors manufactured from solid grade laminate from Abet Laminati in colour Sand. Our laminate lockers provide a modern, heavy-duty finish, perfect for changing rooms where the lockers are to be used on a regular basis. The lockers were finished with a Lowe and Fletcher Hasp lock and black laminate number plates, an aesthetically pleasing pairing.

As always, our installation team worked hard to provide the best finish to the project. We have enjoyed working alongside Lucas Ltd and look forward to seeing the Paddington Cube finished and open in 2023.

If you have a project that needs Z lockers, or a bespoke locker design, get in touch today. Call on 01284727626 or click here to get a quote.

Read more of our case studies here:

Heated Z Locker at Four New Bailey

Cringleford Sports Pavilion Leisure Package

Northgate House Lockers and Cubicles Project

Bespoke Laminate Lockers at 25 Tavistock Place

Heated Lockers

Production Park Innovation Hub Heated Lockers Project

Heated Lockers – Innovation Hub at Production Park

Project Details

Client: Triton Construction Ltd
Location: South Kirkby, Pontefract
Project Value (approx): £10k
Year Completed: 2022

Heated Lockers

Heated Lockers were the focus of Helmsman’s most recent project. We travelled up to South Kirby in Pontefract, Yorkshire to work alongside Triton Construction at the brand-new Innovation Hub at Production Park. Production Park is a unique support environment for the live events industry, uniting technology, creative spaces and education. Their newest venture is the brand-new Innovation Hub, with a large research studio with connected offices and teaching spaces. The new innovation hub features specialist equipment designed to support the live events industry as well as a business support programme focusing on assisting SMEs.

In an area off the main entrance lobby, Helmsman installed a set of Wet Specification Heated Lockers. With a mix of 1, 2 and 4 compartments, these lockers are designed with a single or twin tube heater at the bottom of the locker, hidden within the locker stand, and perforations throughout to allow warm and/or damp air to circulate and escape the locker.

Triton Construction requested a modern, heavy-duty laminate finish for these heated lockers. The body of the lockers was manufactured from aluminium and powder coated in colour Ice, whilst we used Biocarbon’s Solid Grade Laminate in colour Elegant Grey for the locker doors, end panels and cladding. This laminate is a great choice as it is carbon neutral as well as being moisture resistant and easy to clean, perfect for a semi-public area such as this project. Our heated lockers can either come with a standard 3-pin power plug or can be available with a spur to wire into a fused switch. Triton construction requested a plug which was positioned on the end panel of the bank of lockers.

We paired stainless steel numbers recessed into the doors with Lowe and Fletcher camlocks for a seamless finish to the lockers. This option of lock is simple and cost-effective, whilst also safe and secure.

It was great to work with Triton Construction on this project and we look forward to hearing about the success of the Innovation Hub at Production Park in the future. If you have a similar project or want to know more about our Heated Lockers, contact us today on 01284727626 or click here to Get a Quote.

Read more of our case studies here:

Heated Z Locker at Four New Bailey

Cringleford Sports Pavilion Leisure Package

Northgate House Lockers and Cubicles Project

Bespoke Laminate Lockers at 25 Tavistock Place

mccormick staff lockers

McCormick, Haddenham Staff Lockers & Benches

McCormick Haddenham, Staff Lockers and Bench Seating

Project Details

Client: McCormick UK Ltd
Location: Haddenham, Buckinghamshire
Project Type: Staff
Project Value (approx): £20k
Year Completed: 2022

McCormick Haddenham

Project Overview

Helmsman’s most recent project was for a company we have enjoyed working with in the past. McCormick are a global leader in flavour, with Schwartz, Franks RedHot and French’s just a selection of their globally well known brands. Back in 2021, we were asked to manufacture and install a variety of lockers in their new Cambridge facilities, from garment collectors, garment dispensers through to office and visitor lockers. Take a read of that project’s case study.

This year we had the pleasure of working with McCormick again for their UK HQ in Haddenham, Buckinghamshire. The client requested lockers for their staff members and so Helmsman supplied and installed 164 mild steel, 1 compartment lockers with sloping tops and stands. The colour scheme was kept bright but professional, with a selection of colours including standard “Ice” coloured body with blue, red and yellow doors.

Helmsman’s Essential Metal Lockers are manufactured from mild steel, and powder coated in our factory with our new paint booth. There are a variety of colour options, with those chosen by McCormick being Royale (blue), Cherry (red) and Yellow. The lockers were finished with Lowe and Fletcher Camlocks, a simple, secure and easy to use option, perfect for the staff lockers required by McCormick.

In addition to the lockers, Helmsman also supplied bench seating for McCormick’s Haddenham HQ. We produced 10 double sided benches, with coat hooks and Ash Hardwood seating slats.

The lockers and benches really do look fantastic at McCormick’s Haddenham HQ. It was great to work with McCormick again and we hope to help them with any locker, cubicle or bench seating requirements they have in the future.

Ipswich Town Football Club

Ipswich Town Football Club

Ipswich Town Football Club Project

Project Details

Client: Mixbrow Construction Ltd
Location: Ipswich, Suffolk
Project Type: Sport and Leisure
Project Value (approx): £15k
Year Completed: 2022

Ipswich Town Football Club

Project Overview

Ipswich Town Football Club is constantly evolving and has recently been undergoing many stadium improvements. Including brand new hugely anticipated LED digital perimeter advertising and two-camera footage on iFollow Ipswich for fans to watch live streams of the games should they not be able to attend. Part of the fantastic stadium improvements also included a brand-new coaches’ changing rooms, which Helmsman had the opportunity to manufacture and install.

We were excited to get to work with not only an important Suffolk club, but also to be working with a local team, as many of our recent projects have been a large distance from our Bury St Edmunds factory from the North of Scotland, all the way down to Exeter.

This project consisted of many Helmsman products, with lockers, cubicles, vanity units and IPS panels being supplied. Alongside the team at Mixbrow Construction and Ipswich Town FC, we designed, manufactured and installed 8 bespoke 1 compartment laminate lockers, 1775mm high x 400mm wide x 500mm deep on a cantilevered seat stand. The theme of the changing rooms was kept slick and professional, with See Group’s Biocarbon Laminate used in colour Gabbro. This fantastic carbon neutral laminate is strong, moisture resistant, easy to clean and has antibacterial protection, perfect for a changing room project. The locks chosen for the lockers were Lowe and Fletcher 2800 combination locks, also a great choice for the coaches’ changing rooms.

Whilst we offer a wide range of cubicle options, we worked with the team at Mixbrow Construction to design a bespoke floor to ceiling cubicle to fit their needs. The changing room design featured 2 Bespoke Floor to Ceiling shower cubicles and 1 Bespoke Floor to Ceiling Toilet Cubicle. Also included in the project were 4 sets of IPS (Integrated Plumbing System) Panels and a Solid Grade Laminate Vanity unit, all in matching Solid Grade BioCarbon Laminate in colour Gabbro.

It was great to work alongside Mixbrow Construction on this project and look forward to working on more local projects in the future.

Need bespoke options for your project? Or maybe you love the sound of Carbon Neutral materials being used in your changing room refurbishment? Contact us today for more information and a quote for your project. Call 01284727626 or email us at enquiries@helmsman.co.uk.